British Columbia

237 itinéraires dans British Columbia. Trouvez votre prochain parcours sur Isomaps — cartes topo, GPS et profil altimétrique.

Lighthouse Country Regional Trail South Loop
Lighthouse Country Regional Trail South Loop

Dunsmuir, Canada

5,30 km +207 m 1h 20min

Très facile
Sooke Flowline
Sooke Flowline

Leechtown, Canada

38,76 km +1 723 m 12h 45min

Très difficile
Flatiron
Flatiron

Needle Peak, Canada

1,69 km +170 m 55min

Très facile
Dewdney Trail
Dewdney Trail

Mount Ford, Canada

16,82 km +1 106 m 10h 15min

Difficile
Waterfront Esplanade
Waterfront Esplanade

Brow of the Hill, Canada

4,23 km +92 m 40min

Très difficile
Thom Creek Trail
Thom Creek Trail

Promontory, Canada

3,16 km +403 m 1h 15min

Facile
Tikwalus Heritage Trail
Tikwalus Heritage Trail

Chapmans, Canada

7,38 km +926 m 3h 15min

Difficile
Bridle Trail
Bridle Trail

Harrison Hot Springs, Canada

3,35 km +99 m 1h 0min

Très facile
Sooke Hills Wilderness Trail
Sooke Hills Wilderness Trail

Humpback Reservoir, Canada

13,18 km +756 m 4h 25min

Modéré
Great Glacier Trail
Great Glacier Trail

The Overlook, Canada

2,15 km +283 m 55min

Facile
Perley Rock Trail / Sir Donald Trail
Perley Rock Trail / Sir Donald Trail

The Overlook, Canada

2,98 km +519 m 1h 20min

Facile
Avalanche Crest Trail
Avalanche Crest Trail

The Overlook, Canada

3,94 km +807 m 2h 5min

Modéré
Young's Peak Traverse
Young's Peak Traverse

Asulkan Glacier, Canada

9,86 km +806 m 8h 0min

Modéré
Celeste Lake Connector
Celeste Lake Connector

Emerald Glacier, Canada

4,14 km +44 m 1h 5min

Très facile
Yukness Ledges Alpine Route
Yukness Ledges Alpine Route

Biddle Pass, Canada

2,43 km +236 m 1h 15min

Très facile
Vermilion Peak Route
Vermilion Peak Route

Vermilion Peak, Canada

3,80 km +1 205 m 2h 50min

Difficile
Lake Oesa Route
Lake Oesa Route

Yukness Mountain, Canada

3,64 km +524 m 4h 40min

Facile
Mount Owen Route
Mount Owen Route

Mount Owen, Canada

7,10 km +3 149 m 12h 55min

Très difficile
TCT: Trans-Canada Trail (Vancouver Island)
TCT: Trans-Canada Trail (Vancouver Island)

James Bay, Canada

15,21 km +314 m 3h 45min

Très difficile
Takakkaw Lake Route
Takakkaw Lake Route

Daly Glacier, Canada

3,58 km +785 m 3h 50min

Modéré

Prêt pour ta prochaine sortie ?

Essayez Isomaps gratuitement pendant 7 jours. Disponible sur iOS et Android.

Télécharger sur iOS Télécharger sur Android APK (sans Google)
Isomaps Vos sorties outdoor, partout, même sans réseau
Installer Installer